Here are the steps to change the status
1. Log into the JDEPLAN environment.
2. Begin to apply the ESU in attended mode.
3. When you receive the error on the Control Table Workbench screen, click the Solution Explorer icon on your task bar to return to the main screen.
4. In the fast path, enter GH961 and select Custom Installation Plan or navigate to: Foundation Systems|Tools|System Installation Tools|Custom Installation Plan (P98240).
5. Click FIND then look for the latest plan for your ESU. Each time you apply or attempt to apply a software update a new plan is created and appended with the next sequential number (e.g. JL123 - 3).
6. When you find the latest plan (i.e. the active one you are executing), expand it. Expand down through the trees to open Environments, then the environment (e.g. DV900), then Control Table Merges. Highlight on Control Table Merges and click the SELECT button.
7. Click in the row for the job you wish to change, e.g. R98800 for the Workflow Merge. Using the visual assist, change the Detail Status from 50 (Failed) to 60 (Installed) and click the SAVE button. Then close the form (you can click the SELECT button again to go back in to be sure your change was saved).
8. From the task bar, click on the task for the Software Updates application again to resume your installation.
9. On the form for Control Table Workbench, click the PREVIOUS button. Then, click the NEXT button. This should allow you to move past the Control Table Workbench as you've now set the job to installed for the plan that is executing.
- Aug 17 Fri 2012 16:29
change the status and continue with the ESU install manually
close
全站熱搜
留言列表